Commercial Heating Gas Appliance Assessments

CORT 1
Overhead Radiant Tubes

Radiant Tube and Plague Heaters

MET 4
Commercial Gas Meters

Installation and commissioning of Gas Meters with a badge capacity between 6m³/hr and 40m³/hr.

CDGA 1
Direct Fired Heating Appliances

Non Domestic Direct Space Heaters

CIGA 1
Warm Air Heaters
CH Boiler over 70KW

Non Domestic Indirect Heating Appliances. CH Boilers>70Kw and warm Air Space heaters.

ICPN 1
Pipework & Fittings

Assembly and testing of Non Domestic pipework and fittings.

TPCP 1 / TPCP 1A
Tightness Testing & Purging

Testing and Purging of Non Domestic pipework with an installation volume >0.035m³

EFJLP1
Electro Fusion Welding

For connecting and jointing MDPE underground pipeworking installation

All Appliance Assessments are ½ day, plus ½ day training if required.